Geomix®

Cost-effective and, more eco-friendly structures

The Geomix® process uses the soil mixing technique across a broad spectrum of applications, including soil improvement, retaining walls or cut-off walls: a technique well understood by the teams of Soletanche Bachy.

01/02
Geomix® process

The Geomix® process combines the Deep Soil Mixing technique with Hydrofraise® technology to build in situ soil-cement elements of rectangular cross section.

The technique uses two pairs of rotating drums to destructure the soil while combining it with a cement grout. This equipment is compatible with many types of base carriers making it particularly flexible in use. This type of equipment is also known as CSM (Cutter Soil Mixing).

 

The soil/cement mixture can reach an average compressive strength of 6 MPa and hydraulic permeability values below 10-6 cm/s.

 

The Geomix® process is used to form soil/cement barrettes in a single bite.

 

Continuous walls can be created by a succession of overlapping bites, built following a primary secondary sequence.

Used without structural reinforcement, the resulting walls can form low permeability barriers or be used for ground improvement purposes, such as slope stabilisation and liquefaction mitigation.

Temporary or permanent retaining walls can be created when combined with structural reinforcement, usually in the form of metal profiles incorporated into the mix.

 

Wall dimensions

As with a Hydrofraise® wall, the wall thickness corresponds to the width of the drums used to create it: these range from 500 mm to 1,200 mm.

What are the advantages of this technique?

A more economical support of excavation solution beneath groundwater level

A patented solution for the construction of permanent retaining structures

Real-time control of verticality

Cut-off walls with lower permeability than slurry walls

Reduced consumption of natural resources (less water and no addition of aggregates)

Little or no addition of concrete or external material (only cement)

Little spoil wastage

No heavy handling of rebar cages

No vibration during the process

Can be used within less than one metre of existing structures

Saves time as it is often unnecessary to build guide walls

Compatible with low headroom conditions

Soletanche Bachy’s advantages

Soletanche Bachy’s advantages

  • The combination of our know-how about Deep Soil Mixing technique and Hydrofraise® technology
  • Recognised expertise in cement grouts and drilling fluids
  • In-depth knowledge of the properties of the soil-cement mixture, allowing to offer specific mix designs that are optimised and dedicated to each site

Implementation

Geomix® is a 2-phase process. A downward phase to destructure the soil and an upward phase to homogenise the mix. The grout binder can be incorporated during either of these two phases.

 

For support of excavation purpose, Geomix® walls usually incorporate structural reinforcement to counteract the bending forces due to earth pressure. These profiles are inserted into the fresh mix. The soil/cement material is stressed in compression arches between the profiles. The very low permeability of the material protects the excavation from water ingress through the wall.

Geomix® walls are checked and monitored at various stages of their construction and at different levels:

– Regular monitoring of grout properties and grout design

– Real-time rig positioning and real-time verticality controls

– A dedicated supervision system embedding the latest data transmission technology, checking simultaneously the mix homogeneity and the quantity of binder incorporated.

– Properties of the final material can be checked by sampling the fresh mixture and/or core drilling

Execution controls and monitoring

Did you know?

The Geomix® process has been used for many applications… urban excavations, shafts, cut-off walls, quay repairs, liquefaction mitigation, TBM break in/break outs, soil improvement, etc. … and in many business sectors, from residential and commercial buildings to industrial facilities, public landfill sites, road and subway tunnels, airports and nuclear power plants.

 

 

Many Geomix® projects have been completed in recent years:

Geomix / Deep Soil Mixing /

Peilz tower, extension of Nestlé headquarters, Switzerland

Support of excavation for construction of two administrative buildings and for 3-storey underground car park. 6,000 m² of Geomix wall have been built as a support of excavation.

The Deep Soil Mixing family of techniques also includes processes other than Geomix®: